Reproject Your Project Data

Reprojection allows you to take your collected data and order accurate deliverables.

Remember that will have previously defined your CRS (the projection your lidar data was captured in) prior to this step.  

R2A Users click here for more information

DJI L1 Users click here for more information

Setting Your Reprojection

If you need your deliverables in state plane, a local projection system, or in units other than meters you WILL need to reproject your data.

Follow these Steps:

1. Locate the "Reproject" tab (item #3 in the Manage Project checklist) in your new ROCK Cloud project

2. Select the unit your reprojection system is in (feet or meters).

3. Select the Horizontal datum by clicking "Select a Projection" in the Horizontal box and either using a suggested option or manually searching  with text or EPSG code.
4. Select the Vertical datum by clicking "Select a Projection" in the Vertical box and either using a suggested option or manually searching  with text or EPSG code.

5. Click Save at the bottom left.

 

Pay special attention to the Projection Unit at the top of the box as well as ft vs ftUS in the unit type (if using feet).

    Use the navigation menu below to continue the tutorial.

    ROCK Cloud Tutorial

    Create a Project

    ROCK Cloud Tutorial

    Add GCP to the Point Cloud